วันเสาร์ที่ 25 กันยายน พ.ศ. 2553

Constructing the Golden Gate Bridge

Installation of a replica of the Golden Gates Bridge at the Washington Convention Center, Washington DC on Oct 8, 2008 at the TCT trade show. Truss work and cable design were done by shop supervisor Paul Gago. Realistic visuals and rivet finish were executed by prop designer Scott Assetta. Construction work done by the Champion Exposition Services Prop Department, Middleboro, MA 508-923-5374.



http://www.youtube.com/watch?v=WPHJxrYEN-c&hl=en

Tags : Strength Training Digital Cameras Civil Engineering Dining Room Furniture

ไม่มีความคิดเห็น:

แสดงความคิดเห็น