The Port of Long Beach has unveiled plans to replace the aging Gerald Desmond Bridge. Built in the 1960s, the bridge was not designed for present demands and is obsolete. The $1.1 billion dollar project will improve traffic flow, increase safety and support, on average, 4000 jobs a year for the five years of construction.
ไม่มีความคิดเห็น:
แสดงความคิดเห็น