Construction of Hoover Dam, 1933-1935

Originally called Boulder Dam, the Hoover Dam straddles the border of Arizona and Nevada. Construction began in 1933 and was completed two years later. Built with 3.2 million cubic yards of concrete, the dam is some 726 feet high, ranking 20th in the world for height. From 1939 to 1949 it was the worlds largest producer of hydroelectric power; today the dam generates some 4.2 billion kilowatt-hours of electricity annually. Lake Mead, the reservoir created by the dam, covers 247 square miles and is a major recreation area. Construction footage of the building of Hoover Dam. (US Bureau of Reclamation, US Department of the Interior)



http://www.youtube.com/watch?v=GLs3H_0yfKw&hl=en

See Also : ADVERTISING หมวดงานระบบไฟฟ้าและเครื่องกล HDTV Best Deals Thai Food Seasoning Lcdtv 3d Nx710 Deal

วันเสาร์ที่ 17 ธันวาคม พ.ศ. 2554

วันพฤหัสบดีที่ 1 กันยายน พ.ศ. 2554

Hoover Dam-Bridge Construction

July 08 progress of the bridge,river was closed around the bend so no view of the Dam



http://www.youtube.com/watch?v=K2lNkN8HqHo&hl=en

Recommend : Cheap & Discount 50% or More Men's Jewelry Best and Cheap Concrete Beam

วันอาทิตย์ที่ 10 กรกฎาคม พ.ศ. 2554

Hoover Dam Bypass Bridge Project Status: The Bypass Bridge is Connecting at Hoover Dam

Become an affiliate of ours at www.MustSee.biz The Hoover Dam Bypass Bridge's 1060 foot twin-rib concrete arch is connecting! Here's what it looks like on August 1st, 2009. The Colorado River Bridge is the central portion of the Hoover Dam Bypass Project. When completed in 2010, the Hoover dam bypass bridge will span Black Canyon (about 1600 feet south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River.



http://www.youtube.com/watch?v=uzyxXbCtX04&hl=en

Friends Link : Hand and Nail Level Construction Newest Technology Gadgets

วันเสาร์ที่ 18 ธันวาคม พ.ศ. 2553

Hoover Dam Bypass Bridge Construction Time Lapse

Hoover Dam Bypass Bridge Construction Time Lapse Video September 2006 - July 2010 Courtesy: Federal Highway Administration



http://www.youtube.com/watch?v=fu4_gY5TFOY&hl=en

Tags : Best & Cheapest Amazon Hot New Releases Bored pile Foundation Best & Cheapest Mascara & Eyelash

วันเสาร์ที่ 10 กรกฎาคม พ.ศ. 2553

วันอังคารที่ 22 มิถุนายน พ.ศ. 2553

Hoover Dam bypass advance 4/08

this is footage of the progress on the Hoover Dam bridge bypass. This bridge will shave up to an hour off travel time traversing the Colorado river.



http://www.youtube.com/watch?v=Ys8DA6PQpN0&hl=en

See Also : Civil Engineering Civil Engineering Forum Soil Test Construction Control CIVIL ENGINEERING COURSE

วันอังคารที่ 25 พฤษภาคม พ.ศ. 2553

Driving over the Hoover Dam - US 93 Arizona to Nevada

Driving from the Arizona side of the Hoover (Boulder) Dam to Nevada. Showing some of the new bridge construction, which presumably when completed they will stop vehicles over the dam altogether. Hoover Dam, also known as Boulder Dam, is a concrete gravity-arch dam in the Black Canyon of the Colorado River, on the border between the US states of Arizona and Nevada. The dam, located 30 miles (48 km) southeast of Las Vegas, is named after Herbert Hoover, who played an instrumental role in its construction, first as Secretary of Commerce and then later as President of the United States. Construction began in 1931 and was completed in 1935, more than two years ahead of schedule. The dam and the power plant are operated by the Bureau of Reclamation of the US Department of the Interior. Listed on the National Register of Historic Places in 1981, Hoover Dam was designated a National Historic Landmark in 1985. Lake Mead is the reservoir created behind the dam, named after Elwood Mead, who oversaw the construction of the dam.



http://www.youtube.com/watch?v=9lIFT6qH3r8&hl=en

Foundation Engineering Concrete Slab Foundation Spacing

วันพุธที่ 21 เมษายน พ.ศ. 2553

วันเสาร์ที่ 3 เมษายน พ.ศ. 2553

New Hoover Dam Bridge (July 2009)

Here's another clip of the progress on the Hoover Dam Bypass Bridge. (7/25/09) It appears that the arch is nearly finished. **Construction of the Colorado River Bridge is advancing with construction of the 1060 foot twin-rib concrete arch. The Colorado River Bridge is the central portion of the Hoover Dam Bypass Project. Construction on the nearly 2000 foot long bridge began in late January 2005 and the completion of the entire Hoover Dam Bypass Project is expected in June 2010.**



http://www.youtube.com/watch?v=NzyOCKZFQD8&hl=en

Shallow Foundation ??????????????�??????????????? Levi's Jeans Wrangler Jeans Lee Jeans

วันเสาร์ที่ 20 มีนาคม พ.ศ. 2553

New Hoover Dam Bridge (February 2009)

Here is a short clip on the progress at the Hoover Dam Bypass Bridge. (2/24/09) The construction of the bridge over the Colorado River, on with the construction of the twin 1060-foot concrete arch rib. The bridge over the Colorado River is the central part of the Hoover Dam Bypass Project. The construction of almost 2000 meters long bridge began in late January 2005 and the completion of the entire Hoover Dam Bypass Project is scheduled for June 2010.



http://www.youtube.com/watch?v=BU_tGABurTE&hl=en

Piles and Foundation